- Posts: 233
- Thank you received: 6
3 Post Moderation Rule for New Boarders (25 Jan 2021)
New boarders will have their posts moderated - Don't worry if you cannot see your post immediately.
Replace clip
- damiangrady
-
Topic Author
- Offline
- Elite Member
-
Less
More
03 Jun 2016 14:56 #77417
by damiangrady
Replace clip was created by damiangrady
Hi all,
Is there a way to replace a clip with a new one in the time but retain the frame in and out points?
If I do a replace from start, obviously the clip length stays the same in the timeline but the new clip commences from frame 1. Likewise with the from end scenario.
I would try the relink route but I'm getting the incompatible file crap.
Any help would be appreciated.
Cheers
Is there a way to replace a clip with a new one in the time but retain the frame in and out points?
If I do a replace from start, obviously the clip length stays the same in the timeline but the new clip commences from frame 1. Likewise with the from end scenario.
I would try the relink route but I'm getting the incompatible file crap.
Any help would be appreciated.
Cheers
Please Log in to join the conversation.
- Tom Wolsky
-
- Offline
- Moderator
-
03 Jun 2016 15:09 #77418
by Tom Wolsky
Replied by Tom Wolsky on topic Replace clip
If I'm understanding, simple replace should give you want you want.
Please Log in to join the conversation.
- damiangrady
-
Topic Author
- Offline
- Elite Member
-
Less
More
- Posts: 233
- Thank you received: 6
03 Jun 2016 15:19 #77419
by damiangrady
Replied by damiangrady on topic Replace clip
Hi Tom,
Not really as that increases the clip length in the timeline to the entire length of the clip.
Basically, I have a clip in the timeline with its in point at frame 320. I have another clip that I want to replace that with but also need it to start at frame 320.
I could of course dial all of this in or slide edit it into place but it seems like a bit of a faff for something that should be pretty simple.
A simple relink would also solve this issue were it not for the incompatible file nonsense which trust me, is compatible.
Not really as that increases the clip length in the timeline to the entire length of the clip.
Basically, I have a clip in the timeline with its in point at frame 320. I have another clip that I want to replace that with but also need it to start at frame 320.
I could of course dial all of this in or slide edit it into place but it seems like a bit of a faff for something that should be pretty simple.
A simple relink would also solve this issue were it not for the incompatible file nonsense which trust me, is compatible.
Please Log in to join the conversation.
- Tom Wolsky
-
- Offline
- Moderator
-
03 Jun 2016 15:29 - 03 Jun 2016 15:30 #77421
by Tom Wolsky
Replied by Tom Wolsky on topic Replace clip
Relink would never work in any version of FCP. You have to dial in
320 into the browser clip and replace from start.
Misunderstanding because I thought you have IO I the browser clip.
320 into the browser clip and replace from start.
Misunderstanding because I thought you have IO I the browser clip.
Last edit: 03 Jun 2016 15:30 by Tom Wolsky.
Please Log in to join the conversation.
- damiangrady
-
Topic Author
- Offline
- Elite Member
-
Less
More
- Posts: 233
- Thank you received: 6
03 Jun 2016 15:30 #77422
by damiangrady
Replied by damiangrady on topic Replace clip
Thanks Ben, I see.
I always thought the start referred to the beginning of the clip. I didn't realise that was overridden if there's an in point set.
Cheers
I always thought the start referred to the beginning of the clip. I didn't realise that was overridden if there's an in point set.
Cheers
Please Log in to join the conversation.