- Posts: 222
- Thank you received: 3
3 Post Moderation Rule for New Boarders (25 Jan 2021)
New boarders will have their posts moderated - Don't worry if you cannot see your post immediately.
Duplicating a Project/Event
23 Sep 2013 22:05 #31458
by Rbelfi
Duplicating a Project/Event was created by Rbelfi
I'm trying to copy a project and it's event from one hd to another, but each time the footage moved is showing up as alias footage. I've tried selecting with used clips and the option for referenced clips. Any suggestions on how your able to move full pieces to other drives?
Please Log in to join the conversation.
- Tom Wolsky
-
- Offline
- Moderator
-
23 Sep 2013 22:43 #31461
by Tom Wolsky
Replied by Tom Wolsky on topic Duplicating a Project/Event
After you've moved or copied the prospect, use the organize event function, which will copy the media into the original media folder.
Please Log in to join the conversation.
24 Sep 2013 17:45 #31501
by Rbelfi
Replied by Rbelfi on topic Duplicating a Project/Event
If i choose the used clips options will it then only take those clips when I select organize event?
Please Log in to join the conversation.
- Tom Wolsky
-
- Offline
- Moderator
-
24 Sep 2013 18:02 #31502
by Tom Wolsky
Replied by Tom Wolsky on topic Duplicating a Project/Event
Only those aliases will be in the new event folder. If you organize that event only those clips will be copied.
Please Log in to join the conversation.

